How Long Does a Home Remodel Take in Wausau?

Luxury kitchen remodel featuring stone fireplace and modern finishes in Marathon, WI by Ross Construction.

How long does a home remodel take in Wausau?

It’s an important question, and a smart one, because understanding the remodeling timeline helps you plan your life, budget, and expectations with confidence.

In this guide, we’ll look at how long it takes to renovate a house, including kitchens and bathrooms specifically. We’ll also cover what impacts remodeling timelines and how to keep your remodel on track.

On this page:

 

How Long Does It Take to Remodel a House?

In Wausau, a whole-house renovation timeline is usually 3 to 8+ months, depending on size, complexity, and whether the home is occupied during construction. This estimate is based on the work Ross Construction has done in Wausau throughout the years.

How long does a full gut renovation take? A full gut renovation, where the home is stripped to the studs, typically leans toward the longer end of the timeline.

 

Do You Need to Move Out During a Full House Remodel?

Not always, but it depends on the scope.

You may need to temporarily relocate if:

  • Mechanical systems (plumbing, electrical, HVAC) are offline
  • You’re undergoing a full gut renovation
  • You have young children or sensitivities to dust/noise
  • Multiple bathrooms or the kitchen are out of service simultaneously

Homeowners sometimes choose to stay during partial renovations, but whole-home remodels are typically smoother, faster, and safer if you’re not living in the space. Either way, Ross Construction helps you plan ahead so you know exactly what to expect.

For more help with planning, see our Cost Guide.

 

Wausau Kitchen Remodeling Timelines

The average time for a kitchen remodel in Wausau typically falls between 6 to 12+ weeks, depending on the scope, selections, and whether structural changes are involved.

 

What Can Speed Up or Slow Down a Kitchen Remodel in Wausau?

Things that can speed up your kitchen remodel:

  • Making selections early
  • Choosing in-stock or standard cabinetry
  • Keeping your existing layout

Things that can extend timelines:

  • Custom cabinets or imported materials
  • Major layout changes (walls, plumbing, ventilation)
  • Holiday schedules and winter shipping delays

No matter what kind of kitchen remodel you want, Ross Construction’s design-build process brings clarity to every step.

 

Wausau Bathroom Remodeling Timelines

For most projects, the bathroom remodel duration in Wausau ranges from 3 to 8+ weeks, depending on the size of the bathroom and the complexity of the upgrades.

 

Primary vs. Guest Bathroom Timelines

The size and purpose of the bathroom play a big role in how long a remodel takes.

Primary Bathrooms (5 to 8+ weeks)

Primary suites typically take longer because they often include larger layouts, custom tile showers, dual vanities, upgraded plumbing or electrical, and premium features like in-floor heat.

Guest or Secondary Bathrooms (3 to 6+ weeks)

These spaces are usually smaller and simpler, with standard tub/shower units, single vanities, and minimal layout changes—making them faster to complete.

Powder Rooms (2 to 4 weeks)

With no shower or tub and limited plumbing, powder rooms are the quickest to remodel.

No matter which type of bathroom you’re planning to remodel, having a clear timeline helps you feel prepared and confident from the start. As a trusted Wausau bathroom remodeling contractor, Ross Construction guides you through each step with clear communication, dependable scheduling, and craftsmanship you can count on.

 

What Impacts Your Home Remodeling Timeline?

While every remodel is unique, several factors influence how long your project will take. Understanding these ahead of time helps set clear expectations and keeps your project running smoothly from the first conversation to the final walkthrough.

 

Scope and Complexity of the Project

A cosmetic refresh is much faster than structural work, layout changes, or a whole-home renovation. Larger projects take longer simply because they require more skilled labor, materials, inspections, and sequencing.

 

Structural and Layout Changes

Anytime you move walls, re-route plumbing, or upgrade electrical systems, the home remodeling timeline in Wausau gets longer. These steps require engineering, permitting, and careful coordination.

 

Material Selections and Lead Times

Custom cabinetry, stone countertops, specialty fixtures, and imported materials can add weeks to the timeline. Choosing selections early is one of the easiest ways to keep your remodeling timeline on track.

 

Permitting Requirements in the Wausau Area

Permits are essential for safety and code compliance. While turnaround times vary, projects involving structural changes or additions typically require more review and approvals.

 

If You Stay in the Home During Construction

Living in the home doesn’t necessarily slow a project down, but it may affect sequencing, working hours, or safety measures.

 

Seasonality and Wausau Weather

Because of our freeze/thaw cycles, certain work (especially additions or foundation work) is best done outside the winter months. Interior remodels, like kitchens and baths, are far less affected.

 

Availability of Specialty Trades

Electrical, plumbing, HVAC, and specialty installers all play crucial roles. High-quality trades get booked quickly, so planning ahead helps maintain an efficient schedule.

 

Understanding these makes it easier to plan a realistic home remodeling timeline in Wausau. Ross Construction makes sure you’re always aware of what is affecting your home remodel, so you are never left in the dark.

 

How Do Remodeling Timelines Differ in Colder Months in Wausau?

Winter is a great time for many indoor projects, but not all work can be performed efficiently in freezing temperatures. Here’s how winter affects remodels:

  • Whole-home remodels: Indoor portions can proceed, but exterior tie-ins may be delayed during severe cold.
  • Kitchens and bathrooms: These interior spaces can be remodeled year-round with minimal interruption.

While winter doesn’t halt remodeling, it can delay certain phases, especially anything structural or exterior.

 

What’s the Best Time of Year to Remodel in Wausau?

For outdoor-heavy projects like additions and major structural renovations, the ideal window is March through December, which is the region’s busier construction season.

If you’re looking at a kitchen or bathroom, you can remodel comfortably any time of year, including the winter months.

Regardless of your project type, the best time to reach out is as early as possible. Early planning secures your spot on the schedule and gives us time to guide you through selections and design.

 

 

How to Keep Your Remodel on Schedule

No matter what type of project you’re planning, the right preparation goes a long way. Ross Construction has built a process designed to simplify decision-making and reduce stress, so you always know what’s next.

Here’s what helps keep your average home remodel timeline running smoothly:

 

Start With a Clear Vision

Knowing your goals, style preferences, and investment range helps us guide you with confidence from day one.

 

Make Selections Early

Choosing cabinets, countertops, tile, plumbing fixtures, and lighting early prevents lead-time delays. This is one of the biggest timeline savers.

 

Follow a Proven Design-Build Process

Our structured approach helps eliminate surprises and gives you clarity at every step.

 

Communicate Regularly

We believe communication is the backbone of a great remodel. Our team keeps you updated with progress, next steps, and any decisions needed to keep your project moving.

 

Plan for Seasonal Considerations

Winter doesn’t slow indoor projects, but additions and exterior work are best scheduled around Wisconsin’s frost cycles. Discussing timing early helps avoid seasonal bottlenecks.

 

Work With a Trusted, Experienced Team

When you choose a reputable remodeling contractor in Wausau, you’re gaining a partner who takes the stress out of remodeling. Our team of skilled carpenters, trusted subcontractors, and dedicated project managers all work together to deliver craftsmanship that lasts.

 

Your Remodeling Timeline Made Simple

Every remodel has its own rhythm, from quick bathroom updates to full-scale home renovations that unfold over several months. Understanding how long each phase takes helps you feel more prepared, informed, and confident. Timelines vary, but with thoughtful planning, early selections, and a well-structured process, your project can stay on track and free of surprises.

Ross Construction brings clarity to each step of the journey. Our team is built on communication, craftsmanship, and a commitment to guiding you through a smooth and enjoyable remodeling experience.

 

Contact Us

Contact us today to start your discussion with one of the best kitchen, bath, and whole home remodelers near Wausau.

Ross Construction Cost Guide

Remodeling and Additions Pricing Guide

Our cost guide walks you through common considerations and local Wausau price points for your project so you can gain the insights you need to turn dreams into reality. From whole-home remodels to bathroom remodels, we are committed to a home-building experience that you have never had before.

  • Cost estimate guides
  • Itemized pricing
double_arrow